Our 7 month long journey building out our climbing van! 591 photos
November 6, 2018

Tuesday, November 6



We bought a van!!!

Van purchased! Aahhh!
6 Nov 2018 - 18:32
Van purchased! Aahhh!
6 Nov 2018 - 18:32

Thursday, November 8



Dog's first time in the van
8 Nov 2018 - 20:59

Kinda looks like he's standing over his own chalk outline from a doggy murder.
Copernicus followed us to the van
8 Nov 2018 - 21:18
First night of van work
8 Nov 2018 - 21:18

Unscrewing some of the wood paneling that came on the walls.
First night of van work
8 Nov 2018 - 21:35

Unscrewing some of the wood paneling that came on the walls.
Copernicus looking on
8 Nov 2018 - 21:36
Progress at the end of night one
8 Nov 2018 - 21:38

Saturday, November 10



Taking down the bulkhead
10 Nov 2018 - 13:32
Progress removing the old walls
10 Nov 2018 - 14:43

Sunday, November 11



Lucky supervising on a nice fall day
11 Nov 2018 - 13:27
Floor finally removed. Lots of dirt and rust.
11 Nov 2018 - 15:10

We'll have to clean all of this out and remove the rust before we can begin building
Floor cleaning/painting before and after
11 Nov 2018 - 15:10

We had to remove all of the old dirt and epoxy from the floor, grind down the rust, then repaint the metal.

First version of the van layout complete. All of the features we want are in, there might be some tweaking going forward, but this should be pretty close to the final version.

Under Bed Storage, our "Garage"
11 Nov 2018 - 19:00
Early 3D Model of the Layout
11 Nov 2018 - 19:00
Van Layout 3D Model
11 Nov 2018 - 19:00

Monday, November 12



Street parking
12 Nov 2018 - 21:17

Tuesday, November 13



Welcome to our van build! We're about a week into it. We're still cleaning it out and planning what to build in it.

So. Dirty.
13 Nov 2018 - 14:31

It took so much work to remove just a few inches of this dirt/epoxy mixture from the last owner of the van.
Making progress on the floor.
13 Nov 2018 - 14:31
Lucky chooses this seat
13 Nov 2018 - 14:31
Lucky thinks the van is clean enough and would like to play now
13 Nov 2018 - 14:53
Begining to work out the design
13 Nov 2018 - 17:32

Figuring out how much space we have for things.
Giving her a bath
13 Nov 2018 - 18:31

Friday, November 23



Mary helping clean the floor
23 Nov 2018 - 21:19

A long cold night on our hands and knees.

This is hard work, Mary helped out a ton last night, and we're making good head way today. Removing the mixture of years of dirt and epoxy. Starting to move on to removing old caulking now. Hoping to have the cleaning done by the end of Sunday, but it's slow going, so we'll see...

Saturday, November 24



Stacy still working on the floor the next day
24 Nov 2018 - 13:51
Stacy and Lucky working on the floor
24 Nov 2018 - 15:19
The floor is getting cleaner!
24 Nov 2018 - 16:36

Sunday, November 25



Alex cleaning the upholstery up front
25 Nov 2018 - 15:01
Stacy grinding down some rust
25 Nov 2018 - 15:06

Started stripping down the rusted surfaces today and resealing some of the seems that had rusted out. Alex also finished the front cleaning that Mary had been working on last night, it's actually looking nice up there now!

Some van seems were rusted through
25 Nov 2018 - 15:07

We had to clean the seems down to bare metal, then reseal the seem.

Tuesday, November 27



Stacy removing floor plugs to help drain the water
27 Nov 2018 - 19:07

We power washed the floor in the van, so some water collected and needed to be drained.

Thursday, November 29



I took today off work so Stacy and I could finish removing rust and do the final cleaning to prepare for painting. It took all day but at 6pm we finally got to applying the rustolium to all of the rust spots. Next step is applying rust preventing paint to the entire floor, and then the preparation phase is complete!

Stacy grinding down rust spots to bare metal
29 Nov 2018 - 12:00
Getting the floor clean enough to be painted
29 Nov 2018 - 16:12
Ready for rustoleum
29 Nov 2018 - 16:12
Preparing to apply rustoleum!
29 Nov 2018 - 16:51
Applying LOTS of Rustoleum
29 Nov 2018 - 18:25

All of the rust spots had to be covered to help protect against rust in the future.
Applying LOTS of Rustoleum
29 Nov 2018 - 18:33
Rustoleum complete
29 Nov 2018 - 18:34

Once it dried we can apply new paint to further protect it.
Rustoleum complete
29 Nov 2018 - 18:36

Once it dried we can apply new paint to further protect it.

Saturday, December 1



Painting complete!! Just have to wait for it to dry and do some seem sealing and the preparation phase will be complete!

Ready to make some meth
1 Dec 2018 - 13:39

Oh I mean paint the floor.

Tuesday, December 4



Solar panels have arrived!
4 Dec 2018 - 19:06

Thursday, December 6



Floor painting complete!
6 Dec 2018 - 18:08

We also had our mechanic bang out the dents in the wheel wells so that we'd have the full travel distance in our suspension.

Saturday, December 8



More parts arriving every day

Lots of van parts arriving!
8 Dec 2018 - 13:49

Sunday, December 9



Using the old floor to make a pattern for the new floor
9 Dec 2018 - 14:01
New floor pattern traced out
9 Dec 2018 - 14:26

We'll have a nice secure base for the rest of the build by bolting this 3/4" extra dense plywood directly to the frame of the van.
Preparing to cut my first 4x8 sheet of Ply ever
9 Dec 2018 - 17:22

Cutting 4x8 on a table saw takes a bit of practice and skill!
Adam making his first real cut of the van build!
9 Dec 2018 - 17:34
Cut success!
9 Dec 2018 - 17:36
Adam excited about his first cut
9 Dec 2018 - 17:36
Stacy practicing with the jigsaw on some scrap wood
9 Dec 2018 - 18:01

We'd never used any of these tools before, so there would be lots of practice wood in our future.
Stacy making her first real cut with the Jigsaw
9 Dec 2018 - 18:50

Cutting the wheel well out of the floor template

Spent the weekend finishing our research and planning for the flooring, then bought all the materials, and for the first time in this project, began actually cutting wood for the van! Working on getting the foot print for the flooring perfect, and then began cutting it! It will probably be a few days of cutting to finish the flooring, but we're getting there.

Floor pieces coming along
9 Dec 2018 - 19:38

Monday, December 10



More floor progress
10 Dec 2018 - 13:40
Cutting the last floor piece
10 Dec 2018 - 14:42
Last floor peice complete
10 Dec 2018 - 15:29

This was the most complex piece in terms of cut shapes.

Today we finished the floor, it's ready to install the next day we get a chance.

Van getting a jump from Subby
10 Dec 2018 - 17:03

Turns out the van battery was pretty old, would have to replace it.

Van needed a new battery, boy was it difficult to get the jumper cables to reach!

Saturday, December 15



Loading van parts into the car
15 Dec 2018 - 10:48

Getting ready for our first big day of modifying the van it's self!
Setting up to cut holes in the van
15 Dec 2018 - 11:09
Preparing to cut the first hole
15 Dec 2018 - 11:12
Stacy cleaning the roof
15 Dec 2018 - 11:12
Cutting the first hole in the van!
15 Dec 2018 - 11:56

This was scary! And took a really long time because we had no idea what we were doing. Future modifications to the van body would go much smoother.
Cleaning up the edges
15 Dec 2018 - 12:44
Making the frame for the fan
15 Dec 2018 - 13:48
Glueing the fan frame parts together
15 Dec 2018 - 14:18
Glueing the fan frame parts together
15 Dec 2018 - 15:01
Working on installing the frame for the fan
15 Dec 2018 - 15:03
Frame holes drilled
15 Dec 2018 - 15:24
Glueing and screwing the fan frame
15 Dec 2018 - 15:53
Installing the flange for the fan
15 Dec 2018 - 18:20

Lots of caulking to water proof the whole thing.
Waiting for caulk to dry
15 Dec 2018 - 18:31
FAN INSTALLED!!!
15 Dec 2018 - 19:07

Very exciting, this was extremely stressful!
Celebrating fan installation
15 Dec 2018 - 20:11

Took all day, but we got our fan installed! Learned a lot about cutting into the Van body, which was super stressful since you can't really undo a mistake there :P

Sunday, December 16



Working out the position of the bolt holes for the flooring
16 Dec 2018 - 12:15
Dry fitting the flooring
16 Dec 2018 - 13:34
Modifying the flooring to try to find the bolt holes
16 Dec 2018 - 14:37

Doing it in the van because it's raining outside. This would become a trend. So. Much. Rain.
Lucky and Merrill taking a break
16 Dec 2018 - 16:59
All animals enjoying being dry inside
16 Dec 2018 - 18:32

Monday, December 17



Ready to install underfloor insulation!
17 Dec 2018 - 12:21
A small ammount of insulation below the flooring
17 Dec 2018 - 12:49

Just enough to fill the gaps between the floor ribs. We didn't want to lose any real height to this.
Installing the flooring for real!
17 Dec 2018 - 13:40

We had to tap the bolt holes as they were completely destroyed from gunk.
Installing the flooring
17 Dec 2018 - 14:04
Installing the flooring
17 Dec 2018 - 15:46
Installing the flooring
17 Dec 2018 - 15:46
Lucky helping to install the flooring
17 Dec 2018 - 15:46

It took two days, but the floor is insulated and installed!

Tuesday, December 18



Prototyping one of the ceiling studs
18 Dec 2018 - 14:13
Ceiling stud prototype looking better!
18 Dec 2018 - 14:28
Making a router template for the studs
18 Dec 2018 - 14:52
Perfecting the router template
18 Dec 2018 - 15:16

Spent today figuring out our plan for the studs. That decided we started on the hardest part, forming the studs for the ceiling. Tomorrow we'll hopefully get them installed.

Wednesday, December 19



Lucky warming up after working on the van
19 Dec 2018 - 10:02
Lucky warning up some more. He's good at this.
19 Dec 2018 - 11:33
Cutting our first production stud using our template!
19 Dec 2018 - 13:19
Learning to use a router for the first time
19 Dec 2018 - 13:47
Sexy router bit
19 Dec 2018 - 15:38
Our final ceiling ribs complete
19 Dec 2018 - 16:41
Made some custom bolts from AllThread to secure our ceiling studs
19 Dec 2018 - 17:16
Workshop in the van due to rain and cold
19 Dec 2018 - 19:00

Finished and installed the ceiling studs. Tomorrow we'll do the wall studs!

Thursday, December 20



Lucky warming up AGAIN, sheesh
20 Dec 2018 - 09:44
Installing wall studs!
20 Dec 2018 - 12:13

We use two furring strips per stud, which were flexible enough to take on the contour of the van wall.
Making progress on the wall studs
20 Dec 2018 - 13:24
Trying to stay dry
20 Dec 2018 - 16:36

Working on the wall studs in the van to stay out of the rain.
Trying to stay warm while we work
20 Dec 2018 - 16:36
Studs complete!
20 Dec 2018 - 18:59

This was a pretty good early milestone

All of the studs are done! We're ready to move on!

Friday, December 21



Cutting the seconds hole in the van!
21 Dec 2018 - 11:22

This one for the skylight
Cutting this hole went much smoother
21 Dec 2018 - 11:28
Making the frame for the skylight
21 Dec 2018 - 12:47
Trying to keep the frame out of the rain as it dries
21 Dec 2018 - 13:10
Caulking the crap out of the skylight before installing it
21 Dec 2018 - 15:04
Skylight installed!
21 Dec 2018 - 18:59

Woke up at 6am today to take full advantage of the only dry day we'll have for the next week. It took all day but we got the sky light successfully installed. This is the last major van body modification we have to make, so it's pretty exciting to be done with it.

Saturday, December 22



Shopping cedar for the walls
22 Dec 2018 - 13:32
Shopping cedar for the walls
22 Dec 2018 - 13:32
Looking at electronics for the van
22 Dec 2018 - 14:05
Flooring, Studs, Fan, and Skylight complete
22 Dec 2018 - 15:48

Things are starting to move along!
Buying more wood
22 Dec 2018 - 16:21

Lots of research into wood for walls and ceiling and electronics today

Sunday, December 23



Lucky deciding if he really likes this seat
23 Dec 2018 - 13:59
Stacy testing out our guest hammock
23 Dec 2018 - 17:45

We created secure attachment points for a hammock so we can comfortably sleep a 3rd person if need be.
Lucky supervising
23 Dec 2018 - 18:27
Working late
23 Dec 2018 - 19:51
Lucky supervising
23 Dec 2018 - 20:12

Finished up odds and ends that had to be done before we insulated. And we finished getting our hammock attachment points installed for guest sleeping space!

Monday, December 24



Lucky really loves this seat
24 Dec 2018 - 10:30
Begining to install insulation!
24 Dec 2018 - 11:15
Lucky making sure everyone is working hard
24 Dec 2018 - 11:55
Spray foam insulation gets on EVERYTHING
24 Dec 2018 - 11:58

We use this stuff to fill gaps that we can't get to with the RockWool
Buying some spray foam insulation
24 Dec 2018 - 12:45
We need MOAR SPRAY FOAM
24 Dec 2018 - 13:03
Spray foam coming out of everywhere
24 Dec 2018 - 13:47
Learning to use the Kreg Jig
24 Dec 2018 - 17:08

This thing was probably the most important tool to the entire van build.
Saw Dust
24 Dec 2018 - 17:23
Walls fully insulated!
24 Dec 2018 - 19:47

Got the walls insulated! Now we are very itchy.

Thursday, December 27



Whats that?!
27 Dec 2018 - 13:34
What are you looking at?
27 Dec 2018 - 14:35
Finally something I'm good at, supporting insulation as it dries
27 Dec 2018 - 14:37
Ceiling insulation coming along
27 Dec 2018 - 16:40

First layer on the ceiling insulation done, the 2nd layer is trickier, will have to do it another day.

Monday, January 7



Cutting a hole for the solar wiring to enter the van
7 Jan 2019 - 20:17
Installing the solar wire housing
7 Jan 2019 - 20:17
Installing solar panels!
7 Jan 2019 - 20:28

These also have to be caulked so their screw holes are water proof.
Solar panels installed!!!
7 Jan 2019 - 20:50

Solar panels installed! We had to do it at night because we work and this was the only weather window dry enough in weeks!

Saturday, January 12



Owens helping insulate things
12 Jan 2019 - 12:58
Getting ready to insulate the rear doors
12 Jan 2019 - 13:39
Dry fitting insulation
12 Jan 2019 - 14:11
More work on insulating. More spray foam.
12 Jan 2019 - 14:39
Owens insulating the sliding door
12 Jan 2019 - 16:51
Lucky supervising?
12 Jan 2019 - 16:51
Insulating will never be done...
12 Jan 2019 - 17:36

Pretty much finished the insulation, steadily ticking off the tasks on our way to putting up walls.

Sunday, January 13



Making the first garage wall section
13 Jan 2019 - 14:21
Garage wall cuts
13 Jan 2019 - 14:24
Garage wall cuts
13 Jan 2019 - 14:40
Dry fitting the garage wall!
13 Jan 2019 - 14:46

This will also be a critical part of the bed support system.
Some pretty decent free hand cuts I think!
13 Jan 2019 - 15:52
Garage wall getting made
13 Jan 2019 - 15:54
Garage walls installed!
13 Jan 2019 - 17:56
Working late, but garage walls are installed
13 Jan 2019 - 18:07

A little more insulation, then we finished fabricating the"garage" walls and actually got them installed!

Tuesday, January 15



Replacing this license plate light is my vietnam
15 Jan 2019 - 18:31

Thursday, January 17



Cutting the forward most ceiling stud
17 Jan 2019 - 19:39

This is different from the others, so had to be quite custom

Monday, January 21



It's not pretty, but it'll work
21 Jan 2019 - 15:56

This one was crazy difficult to get fit.
Working on insulating the ceiling
21 Jan 2019 - 16:45
Installing the signal booster
21 Jan 2019 - 16:46
Signal booster installed and water proofed
21 Jan 2019 - 16:52

Ticking off lots of small items on our list of the past week or so. Making progress.

Saturday, January 26



Dry fitting wheel well box parts
26 Jan 2019 - 12:43
Setting up for the cut
26 Jan 2019 - 13:14
Making wheel well boxes
26 Jan 2019 - 15:03
First wheel well box installed!
26 Jan 2019 - 15:52
Assembling a wheel well box
26 Jan 2019 - 16:27
Installing a wheel well box
26 Jan 2019 - 16:43
Wheel well boxes installed!
26 Jan 2019 - 16:47

Wheel wells fabricated and installed!

Saturday, February 2



Alex helping start the DC wiring
2 Feb 2019 - 11:44
Our first wire splice
2 Feb 2019 - 13:00
Alex helping wire the DC power system!
2 Feb 2019 - 13:44

This is the system for our lighting, switches, phone chargers, water pumps, pretty much everything. Wet paw prints all over.

Alex helped and we ran the DC circuits that go behind the walls today.

Sunday, February 3



Prototyping the Solar electrical system
3 Feb 2019 - 14:46
Solar charge controller is working!
3 Feb 2019 - 15:00
It's charging the batteries off the solar panels!
3 Feb 2019 - 15:00

Solar system is hooked up and charging the batteries!

Wednesday, February 6



Fitting the garage for it's rubber flooring
6 Feb 2019 - 13:14
Sanding the dirt and grime off the flooring
6 Feb 2019 - 13:50
Preparing to install garage flooring
6 Feb 2019 - 13:50
Keeping warm in the van
6 Feb 2019 - 14:26
Keeping warm in the van
6 Feb 2019 - 14:30
Rubberizing the garage
6 Feb 2019 - 14:31

Had trouble getting the glue to cure because of how cold it was.
Heater helping the glue cure
6 Feb 2019 - 15:08
Stacy sitting on the rubber as the glue cures
6 Feb 2019 - 15:14
More progress on the garage rubber
6 Feb 2019 - 16:31
Glueing down the garage floor
6 Feb 2019 - 16:59

Began installing the rubber garage flooring, it was a very cold day working in the van!

Saturday, February 9



Waning light of a chilly day working on the van
9 Feb 2019 - 17:02
DC Circuit test success!!
9 Feb 2019 - 17:23

Our LED lights running off of our battery system
DC Circuit test success!!
9 Feb 2019 - 17:23

Our LED lights running off of our battery system
Snow man supervising the van work
9 Feb 2019 - 17:55

The fan, lights, and dimmer switches are all working!

Sunday, February 10



Cutting more rubber for the garage
10 Feb 2019 - 14:27
Cutting more rubber for the garage
10 Feb 2019 - 15:42
Cutting the rubber for the garage walls
10 Feb 2019 - 16:03

Cutting the rest of the rubber, but it's too cold to glue it in place today.

Friday, February 15



Working out the ammount of wood we'll need for the walls
15 Feb 2019 - 19:04
Working out the ammount of wood we'll need for the ceiling and doors
15 Feb 2019 - 19:04

Saturday, February 16



Lucky supervising
16 Feb 2019 - 12:02
Wiring up the USB outlets
16 Feb 2019 - 12:19
Wiring up the USB outlets
16 Feb 2019 - 12:19
Trying to stay warm working on the van
16 Feb 2019 - 13:08
Heating up the glue so it'll hopefully work
16 Feb 2019 - 14:35
Sweeping out our garage!
16 Feb 2019 - 17:03
Waterproofing the seems in the garage
16 Feb 2019 - 17:28
Waterproofing the seems in the garage
16 Feb 2019 - 18:12
Shaping the edges
16 Feb 2019 - 18:13
Everyone trying to warm up
16 Feb 2019 - 19:07

We finished installing the rubber flooring in the garage, and water sealed around the edges.

Sunday, February 17



BUYING OUR WALLS!!!
17 Feb 2019 - 13:24

We bought out all of Home Depo's tung and groove cedar
Buying LOTS of wood!
17 Feb 2019 - 13:24

Getting ready to do the ceiling!
BUYING OUR WALLS!!!
17 Feb 2019 - 13:24
Bringing the wood home for the ceiling
17 Feb 2019 - 13:35
Getting ready to cut the first cedar
17 Feb 2019 - 16:49
Cleaning up the dried spray foam before we begin on the ceiling
17 Feb 2019 - 17:48

We finally bought the Cedar for the walls and ceiling and began installing it!!!

Monday, February 18



Garage is looking nice!
18 Feb 2019 - 11:48
Setting up to begin on the ceiling
18 Feb 2019 - 12:29

Trying to keep the wood dry
Installing the first ceiling board
18 Feb 2019 - 13:27
Going into mass production mode
18 Feb 2019 - 14:11

Getting a bunch of ceiling boards cut at once
Tung and Groove
18 Feb 2019 - 14:11
Setting up ceiling cuts
18 Feb 2019 - 14:13
Thats a lot of wood you got there
18 Feb 2019 - 14:38
A section of our ceiling
18 Feb 2019 - 14:38
A section of our ceiling
18 Feb 2019 - 14:38
A section of our ceiling installed!
18 Feb 2019 - 15:22
Testing the fit for our ceiling lights
18 Feb 2019 - 15:30
First overhead light socket
18 Feb 2019 - 16:05
Routing wires for our lighting
18 Feb 2019 - 16:05
First light installed!
18 Feb 2019 - 16:14
Getting more wires routed
18 Feb 2019 - 16:23
Lucky's view of the work
18 Feb 2019 - 17:37
Our work site
18 Feb 2019 - 17:38
TACO BELL
18 Feb 2019 - 18:49

Yes Lucky is interested in tacos

Thursday, February 21



Working on the proper design of the bench so that it will be comfortable
21 Feb 2019 - 16:31

Saturday, February 23



Lucky and Arlo inspecting the job site
23 Feb 2019 - 12:00
Stacy cutting more cedar for the van
23 Feb 2019 - 12:11
The charge controller is installed!
23 Feb 2019 - 12:53

This is more or less where it will actually be installed when everything is complete. And it's working!
Adam very happy about the electrical system working
23 Feb 2019 - 12:53
Arlo here to help supervise
23 Feb 2019 - 13:12
Almost done installing all of the cedar we bought
23 Feb 2019 - 13:13

We need MOAR CEDAR!
Stacy setting up for some specialty cuts
23 Feb 2019 - 13:13
Adam working on the electrical system
23 Feb 2019 - 13:13
Muddy dog
23 Feb 2019 - 14:46
Electrical system mostly in place
23 Feb 2019 - 16:38
Prototype of our electrical control panel
23 Feb 2019 - 16:40
Modifying the flange for the fan
23 Feb 2019 - 16:57
Lots going on in the van right now
23 Feb 2019 - 18:15
Getting work done as we lose the light
23 Feb 2019 - 18:44

Spent the last two days working on the electrical system and ceiling, and both are almost done! Should be finishing up the two tomorrow.

Sunday, February 24



Cutting more light holes
24 Feb 2019 - 12:38
Cutting more light holes
24 Feb 2019 - 12:38
Getting ready to install more ceiling parts
24 Feb 2019 - 12:38
Ceiling is getting close!
24 Feb 2019 - 12:38
Stacy setting up for some cuts
24 Feb 2019 - 12:44
Lighting wires
24 Feb 2019 - 13:00
Cutting more cedar
24 Feb 2019 - 13:40
Adam is tired of cutting cedar
24 Feb 2019 - 13:40
The ceiling is complete!
24 Feb 2019 - 13:43
Dog supervisors approve
24 Feb 2019 - 14:08
Stacy setting up for some cuts
24 Feb 2019 - 14:19
Ceiling with working lights!
24 Feb 2019 - 14:57
Ceiling with working lights!
24 Feb 2019 - 14:57
Sweeping out the van
24 Feb 2019 - 15:19
Garage rubberized, Ceiling installed, and electricity working
24 Feb 2019 - 15:22

This is great progress!
Van looking sexy
24 Feb 2019 - 15:22
Peekaboo
24 Feb 2019 - 15:23
Stacy and Lucky... suprivising
24 Feb 2019 - 15:24

The ceiling is complete! And the electrical system is all in and working, which means we have LIGHTS!

Saturday, March 2



Katy here to help!
2 Mar 2019 - 12:10

Bought more cedar, ready to begin on the walls.
Making a T beam for our bed support
2 Mar 2019 - 12:46

This is much more rigid than just the 2x6 on it's own.
Stacy testing out our first bed support
2 Mar 2019 - 12:48
Bed supports installed!
2 Mar 2019 - 13:37
Lucky supervising the bed support installation
2 Mar 2019 - 14:43
Lucky is not pleased
2 Mar 2019 - 14:43
Arlo taking matters into his own hand
2 Mar 2019 - 14:57
Stacy making LOTS of cuts
2 Mar 2019 - 14:58
Katy and Mary helping put up the walls
2 Mar 2019 - 15:04
Must be a union job
2 Mar 2019 - 15:40
Lucky and Arlo suprivising... Stacy's leg
2 Mar 2019 - 15:41
Katy and Adam getting some cedar cut
2 Mar 2019 - 15:59
Katy and Mary getting some walls up
2 Mar 2019 - 17:10
Katy and Mary getting some walls up
2 Mar 2019 - 17:23
Mary installing walls
2 Mar 2019 - 18:20

Sunday, March 3



Katy and Adam working in the van
3 Mar 2019 - 11:17
Lucky being a male model
3 Mar 2019 - 11:27
Lucky sleeping on the train tracks
3 Mar 2019 - 11:53
Installing the light switches!
3 Mar 2019 - 15:13
Our A/C outlet hack
3 Mar 2019 - 16:33

This will just plug into our inverter.

Monday, March 4



Electrical control panel installed
4 Mar 2019 - 12:26
Main wiring run
4 Mar 2019 - 12:34
Katy installing more wall
4 Mar 2019 - 13:56
Running wires for the main electrical area
4 Mar 2019 - 18:14
Getting more walls up
4 Mar 2019 - 18:14
Bed supports installed!
4 Mar 2019 - 18:44
Lucky thinking about the next section of wall to install
4 Mar 2019 - 22:47

Tuesday, March 5



Lots of electrical systems getting mounted
5 Mar 2019 - 12:23
Mounting the A/C outlet
5 Mar 2019 - 12:23
The main wall sections are complete!
5 Mar 2019 - 16:18

4 long days of van work and we got the walls up! Electrical wiring has all been cleaned up from the mess it was before, and many things are in their actual final locations! And we constructed and installed the bed frame.

Saturday, March 9



Strange angle cut for the ceiling/wall interface
9 Mar 2019 - 10:57
Dry fitting the ceiling/wall interface
9 Mar 2019 - 11:44

It's not quite correct yet, need to change one of the angles.
Worked out a way to make the angle cut on my tablesaw
9 Mar 2019 - 12:20
The new angle
9 Mar 2019 - 12:32
Covering the wall/ceiling gap
9 Mar 2019 - 13:29
Walls and Ceiling complete!
9 Mar 2019 - 15:19

Finished the corners between the walls and the ceiling. This was quite a bit of testing and figuring to get them right.

Sunday, March 10



The Beginning, Painited, Insulated, Walls Up!
10 Mar 2019 - 12:00
Working on the rear door panel
10 Mar 2019 - 15:37
Cutting the rear door panel
10 Mar 2019 - 15:57
Cutting the rear door panel
10 Mar 2019 - 15:59
Rear door panels cut!
10 Mar 2019 - 17:13

Took all Sunday to finally decide on the plan for covering the doors. We're cutting 1/4" Plywood to the odd shapes needed for the doors. Then We're going to paint it and screw it in. Got some of it done, but will take the rest of the week probably to get it done.

Thursday, March 14



Priming the door panels
14 Mar 2019 - 22:29

Friday, March 15



Painting the door panels
15 Mar 2019 - 21:25

Saturday, March 16



Painting the door panels
16 Mar 2019 - 12:04

Final coat of paint!

Installing the gear door panels
16 Mar 2019 - 14:34
Installing the gear door panels
16 Mar 2019 - 14:35
Door panels installed!
16 Mar 2019 - 17:07
Stacy cleaning up the rubber in the garage
16 Mar 2019 - 18:38
Side door panel installed
16 Mar 2019 - 18:39
Dry fitting our storage containers
16 Mar 2019 - 18:42

Gotta make sure our storage plan works now with the bed supports installed!
Dry fitting all of the major components for the van
16 Mar 2019 - 19:14

We need to validate our plan now that we can get real measurements.
Test fitting the long gear, like skiis and portaledge
16 Mar 2019 - 19:14

Yesterday we got the door walls installed, and then test fit all of our storage and utilities.

Sunday, March 17



Organizing the workshop a bit
17 Mar 2019 - 13:36
Lucky sitting on our neighbors door step
17 Mar 2019 - 14:45

Tuesday, March 19



Losing the light as we finish up work in the garage for the day
19 Mar 2019 - 19:03
Fixed the issues with the A/C outlet mounting hole
19 Mar 2019 - 19:54

Wednesday, March 20



Making a jig for cutting raw edge wood
20 Mar 2019 - 19:16
My first edge join!
20 Mar 2019 - 19:35

This is just a test piece
Edge join looks kinda good!
20 Mar 2019 - 20:58

Our next task is getting the toilet and refrigerator installed, which requires some testing and experimenting. So we cleaned out the work shop, bought a few tools and clamps we were missing for this type of work, and have been experimenting a bit with what is the best way to accomplish our goals. We're trying to have it all figured out by the weekend so that we can actually finish the installation over the weekend.

Saturday, March 23



Copernicus supervising
23 Mar 2019 - 11:26
Owens helping make the drawer slide for the toilet
23 Mar 2019 - 13:24
Lucky supervising
23 Mar 2019 - 14:11
Sanding the flooring down to a clean surface
23 Mar 2019 - 14:16
Cutting through the floor for pipes
23 Mar 2019 - 17:49
Cutting a hole for the propane locker vent
23 Mar 2019 - 17:49
Stacy priming the flooring!
23 Mar 2019 - 18:42
Stacy priming the floor
23 Mar 2019 - 18:47
Floor is primed
23 Mar 2019 - 18:58
Propane vent pipe installed
23 Mar 2019 - 20:05
Stacy taping out the floor
23 Mar 2019 - 20:07

preparing to put down our actual flooring!

Finished the toilet assembly and installed it. Got the through hole for the toilet vent drilled and it's fitting is now drying. Also got the water tank installed. Stacy started on the flooring, all preparation today, but tomorrow she'll be installing the final floor!

Sunday, March 24



Laying Out the Kitchen Floor Planks
24 Mar 2019 - 00:00
Laying out the floor planks
24 Mar 2019 - 11:19
Stacy installing our flooring
24 Mar 2019 - 16:04
Stacy installing our flooring
24 Mar 2019 - 16:07
Refrigerator drawer slide complete!
24 Mar 2019 - 16:55
Getting ready to install the refrigerator slide
24 Mar 2019 - 18:37
Refrigerator and Toilet slides installed
24 Mar 2019 - 18:58

Stacy trimming up the flooring
Toilet and water tank installed
24 Mar 2019 - 19:21
Drawer slides for toilet and fridge installed
24 Mar 2019 - 19:21
Getting the big items fitted
24 Mar 2019 - 19:22
Taking a moment to enjoy the progress
24 Mar 2019 - 19:23

Stacy started and finished the flooring all this weekend! Today I made and installed the drawer for the refrigerator so it can slide out from under the bench.

Saturday, March 30



Lucky really likes this seat, even when it's not in the van
30 Mar 2019 - 13:05
Installing the seat swivel
30 Mar 2019 - 13:43
Owens working hard on the chair swivel
30 Mar 2019 - 13:43
Stacy installing the water pump system
30 Mar 2019 - 16:32
Alex supervising
30 Mar 2019 - 16:42
Adam doesn't like what Owens is saying
30 Mar 2019 - 16:43

Sunday, March 31



The cold rainy weather is starting to break
31 Mar 2019 - 11:47
Lucky enjoying the new floor
31 Mar 2019 - 12:52
Some decent cuts!
31 Mar 2019 - 16:28
Stacy working on the plumbing
31 Mar 2019 - 16:56
Lots of plumbing work
31 Mar 2019 - 16:56

This weekend we installed our replacement sun visor, the swivel base for the passenger seat, began installing the pumps and plumbing for our water system, and began making the propane locker.

Monday, April 1



3D Model for the Kitchen Cabinet
1 Apr 2019 - 00:00

Tuesday, April 2



Owens helping on the propane locker
2 Apr 2019 - 20:35

Wednesday, April 3



Lucky testing his climbing rated harness
3 Apr 2019 - 18:04

Friday, April 5



Water heater mounted
5 Apr 2019 - 15:01
Water cutoff valve
5 Apr 2019 - 15:36
Water overflow
5 Apr 2019 - 16:11
NOW it can be a real climbing van
5 Apr 2019 - 18:03

Saturday, April 6



Copernicus inspecting our work
6 Apr 2019 - 12:04
Copernicus shit in a sawdust pile under the table saw
6 Apr 2019 - 12:34
Testing out the propane locker fit
6 Apr 2019 - 16:58

The propane locker is mostly complete, waiting on a part in the mail to finish it.

Sunday, April 7



I made my self some more table space
7 Apr 2019 - 16:28
Bed area created!
7 Apr 2019 - 18:41

Two of the sections are removable for maintenance
Removable bed sections for maintenance
7 Apr 2019 - 18:43
Stacy testing out the bed boards!
7 Apr 2019 - 18:45

Our bed platform is installed! It has two removable sections so we can access the garage for maintenance if needed.

Monday, April 8



Setting up for a big cut
8 Apr 2019 - 15:46
Lucky on his supervisor blanket
8 Apr 2019 - 17:17
Lucky and I watching the rain
8 Apr 2019 - 18:03
Assembling the bench!
8 Apr 2019 - 18:41

Tuesday, April 9



Kreg pocket holes
9 Apr 2019 - 14:32
Lucky inspecting the asphalt closely
9 Apr 2019 - 14:41
Dry fitting bench doors
9 Apr 2019 - 16:26
Keplar and Stacy helping to plan the bench installation
9 Apr 2019 - 23:19

Wednesday, April 10



Designing the through-hole vent for the propane locker and toilet vent
10 Apr 2019 - 15:13
Bench parts ready to install
10 Apr 2019 - 18:32
Installing the bench!
10 Apr 2019 - 19:13
Lucky supervising from his favorite seat
10 Apr 2019 - 19:14
Bench is installed!
10 Apr 2019 - 19:41
Stacy inspecting my work
10 Apr 2019 - 19:44
Light coming through the skylight
10 Apr 2019 - 19:51

After three long days of work, the water system is complete, and the bench is installed!

Thursday, April 11



Propane locker installed!
11 Apr 2019 - 16:34
We got a throw rug. SHIT IS GETTING REAL
11 Apr 2019 - 17:10

We have a throw rug, shit is getting real!

Friday, April 12



Lucky found this rat friend
12 Apr 2019 - 12:17
Copernicus helping in the shop
12 Apr 2019 - 14:21
Shaping the bench doors
12 Apr 2019 - 15:57

Finished the bench support system, and began researching how to build cabinets and designing our kitchen cabinet.

Saturday, April 13



Cut list for the kitchen cabinet
13 Apr 2019 - 11:18
Animals are supervising
13 Apr 2019 - 11:42
Using all available surfaces for some big cuts
13 Apr 2019 - 12:52
Getting creative
13 Apr 2019 - 13:43

Had to make some cuts that were just a bit larger than my rip fence could support, so I set up this jig.
My jig for scribing the van wall
13 Apr 2019 - 15:52

We have to cut the cabinet back to conform to the curve of the van wall.
Scribing the van wall
13 Apr 2019 - 17:00
Scribing the van wall
13 Apr 2019 - 17:00
Scribing the van wall
13 Apr 2019 - 17:00
Stacy making some pipes for the propane system
13 Apr 2019 - 17:36
Baby's first propane fitting!
13 Apr 2019 - 17:39
First pipe section
13 Apr 2019 - 18:25
Pipe coming out of the propane locker
13 Apr 2019 - 18:50
Propane piping
13 Apr 2019 - 19:06
Preparing the cabinet parts
13 Apr 2019 - 20:06
Lots of cabinet parts
13 Apr 2019 - 20:07
Lots of saw dust
13 Apr 2019 - 20:16

Stacy began installing our propane piping. I finalized our cabinet design, cut all of the boards for it, and finished the boards.

Sunday, April 14



Assembling the kitchen cabinet
14 Apr 2019 - 15:48
Assembling the kitchen cabinet
14 Apr 2019 - 15:49
Adam marveling at the cabinet coming together
14 Apr 2019 - 15:56
Sanding the newly assembled cabinet carcass
14 Apr 2019 - 18:03
Cabinet carcass assembled!
14 Apr 2019 - 18:10
Copernicus supervising
14 Apr 2019 - 18:13
Carcass assembled
14 Apr 2019 - 18:16
Test fitting kitchen things in the carcass
14 Apr 2019 - 18:18
Test fitting the counter top
14 Apr 2019 - 18:21

We've finished the carcass of our kitchen cabinet! This is by far the most complex cabinet we will have to make. It's far from done, but this was the hard part.

Friday, April 19



Adam's first cabinet door
19 Apr 2019 - 13:20
Very excited
19 Apr 2019 - 13:20
Propane Valve Installed for the Water Heater
19 Apr 2019 - 16:11

Saturday, April 20



Looking Back
20 Apr 2019 - 15:14

Monday, April 22



The Door for the Propane Cabinet is Ready
22 Apr 2019 - 14:17
Using a Template to Route The Counter
22 Apr 2019 - 16:49

Adam is cutting the counter top so we have space to install the oven
Cutting Out A Space for the Sink
22 Apr 2019 - 18:46

Adam is using a template and router is make the perfect spot for the sink in the counter top
The Oven/Stove and Sink Fit!
22 Apr 2019 - 20:00

Making sure the oven and sink fit into our butcher block counter top before we install the lower kitchen cabinet
Prepping the Wood
22 Apr 2019 - 20:25

Putting wood conditioner onto the butcher block so the stain takes evenly to the surface

Tuesday, April 23



Painting is fun!
23 Apr 2019 - 13:19

Jamie helped paint the bed slats
The Counter is Ready to be Stained
23 Apr 2019 - 13:33

The honey color of the wood comes from the wood conditioner. Now it's ready to stain!
Applying the Stain to the Counter
23 Apr 2019 - 13:38

Painting on the stain before rubbing off the excess
Wiping Off the Excess Stain
23 Apr 2019 - 13:39
First Coat of Stain Done!
23 Apr 2019 - 14:02
Getting the Bench Primed
23 Apr 2019 - 18:44

Wednesday, April 24



Now it's Stained and Ready to Install!
24 Apr 2019 - 15:43
The Bench Top is all Painted
24 Apr 2019 - 19:34
Designing the Tall Kitchen Drawer
24 Apr 2019 - 19:37

Adam's Wood Working experience over the past few months and he was able to design this drawer for the kitchen cabinet

Over the past week we've continued working on the kitchen cabinet, making steady progress. And Stacy began staining and painting lots of the wood work.

Thursday, April 25



The sides of the bench are Painted
25 Apr 2019 - 19:13

Saturday, April 27



The Kitchen Drawer Glue Setting Up
27 Apr 2019 - 12:52

CLAAAMPS
Kickback is dangerous!
27 Apr 2019 - 13:28

This piece of wood jumped, hit the blade then flew off the table. Luckily no one was hurt!
Copurrnicus helping and Lucky Guarding the House
27 Apr 2019 - 13:35
Best Buds Helping Adam get Work Done
27 Apr 2019 - 13:36
Kitchen Cabinet Primed
27 Apr 2019 - 15:11
Shelves Installed in the sliding Kitchen drawer
27 Apr 2019 - 16:25
Painted Surfaces for the Kitchen Cabinet Drying
27 Apr 2019 - 17:14

We were so happy for sunny days when the paint dried quickly

Sunday, April 28



Copurrnicus Driving the Van
28 Apr 2019 - 18:29

Catpurr, your legs are too short and your don't have thumbs. Also, you don't have a license.
Kitchen Cabinet Installed
28 Apr 2019 - 18:37

The bottom kitchen cabinet is complete! Stacy has been working on installing the Furnace and running the propane and water into the new cabinet, still a little work to go there, but we're getting close to being able to do a full systems test of both!

Tuesday, April 30



Testing Out hole sizes for the Heater
30 Apr 2019 - 11:48

Always good to try stuff out before doing it in the van where it can't be (easily) fixed.
Exhaust Hole for the Propane Heater
30 Apr 2019 - 13:50
Heater Vent Installed!
30 Apr 2019 - 19:24

And so much sawdust...

Wednesday, May 1



Trimming the Screws to Make This Fit
1 May 2019 - 13:12

Nothing is made to fit in a van, so we had to customize lots and lots of off the shelf materials...
Getting the Face Frame Glued onto the Drawer
1 May 2019 - 15:39
Doors Installed on the Kitchen Cabinet
1 May 2019 - 19:56

Saturday, May 4



Caulking for the Drop In Sink
4 May 2019 - 13:45
Sink and Faucet Installed
4 May 2019 - 14:54
Under the Kitchen Sink Plumbing
4 May 2019 - 16:21

The white pipe is PEX bringing water in. The green hose will drain water under the van when we are in an area where this is acceptable practice.
Grey Water Tank Installed
4 May 2019 - 16:26

There are valves in place so the water can drain into this tank or straight through down to the ground
Water Heater Installed... For now
4 May 2019 - 18:39

This was the first water heater we installed... that subsequently broke and needed to be replaced.

Sunday, May 5



Water and Propane into the Water Heater
5 May 2019 - 12:21

All the propane connections have valves so they can be turned on/off independently
The Bedside Cabinet is Coming Together
5 May 2019 - 16:19

This cabinet, like the kitchen cabinet, is curved along the back to fit snugly against the van wall
Bedside Cabinet with Top Brace Installed
5 May 2019 - 17:48
Dry Fitting the Bedside Cabinet
5 May 2019 - 18:20

It fits!

Monday, May 6



IMG_20190506_183804
6 May 2019 - 18:38

Stacy completed our water system! And the propane system isn't far behind, it should be completed this coming weekend. I designed and made the carcass for our bedside cabinet, still a bit of work to go before it's ready to install though.

Saturday, May 11



Making the Face Frame for the Bedside Cabinet
11 May 2019 - 11:04

So. Much. Glue.
Getting Ready to Put the Face Frame onto the Cabinet
11 May 2019 - 13:02
Face Frame Attached to the Bedside Cabinet
11 May 2019 - 13:26

We had no idea when we started that we would need so many clamps. Truthfully, we need more clamps..
Bedside Cabinet Primed and Ready for Painting
11 May 2019 - 17:22
Best Buddies
11 May 2019 - 18:50

They both like sitting on this little mat in the driveway
Vacuuming Out all the sawdust before we install the Cabinet
11 May 2019 - 19:54

Husky Shopvac. Best $25 ever.
Installing the Bedside Cabinet
11 May 2019 - 20:11
Bedside Cabinet Installed!
11 May 2019 - 20:12
Bedside Cabinet
11 May 2019 - 20:13
Bedside Cabinet and Bed Slats
11 May 2019 - 20:15

Now we need a bed! Oh wait... so much more to do before that...

The bed side cabinet is installed!

Sunday, May 12



Tightening all the Propane Connections for Testing
12 May 2019 - 16:34

Little did we know at this point that testing and fixing all the connections would take many more weeks
Spraying each Propane to Check for Leaks
12 May 2019 - 16:36

Checking for propane leaks is a simple matter of spraying soapy water on each connections and watching for bubbles to form

Monday, May 13



Design for the Upper Kitchen Cabinet
13 May 2019 - 19:28

This will be storage for pots and pans, dishes, dry goods, etc in the kitchen

Thursday, May 16



Checking the fit for the Upper Kitchen Cabinet
16 May 2019 - 18:34
Putting Together the Pieces for the Kitchen Cabinet
16 May 2019 - 20:50

Saturday, May 18



Putting on Supports for Strength and Stability
18 May 2019 - 11:47
Making the Face Frame for the Upper Kitchen Cabinet
18 May 2019 - 12:52
Gluing the Face Frame Onto the Upper Kitchen Cabinet
18 May 2019 - 14:09

MEGA CLAMPS
Upper Kitchen Cabinet Sanded and Ready to be Primed
18 May 2019 - 14:56
Upper Kitchen Cabinet Primed
18 May 2019 - 15:40
Installing the Upper Kitchen Cabinet
18 May 2019 - 18:14
Upper Kitchen Cabinet Installed
18 May 2019 - 18:26

Sunday, May 19



Installing the Support Dowel for the Bench Back
19 May 2019 - 13:57

The bench back leans a few degrees backwards for comfort so you aren't sitting straight up. This little dowel supports it in that position.
Tightening Propane Connections for the Furnace
19 May 2019 - 16:43

A lot has happened this week! I designed, built, and installed a cabinet, our LAST cabinet! All in a single week, that's the fastest one yet! Stacy has been putting tons of time into the propane system and now has our stove working! Hoping to have the furnace wrapped up in a few days.

Tuesday, May 21



Origami Table Design
21 May 2019 - 22:23

Our table will fold up for storage...

Wednesday, May 22



Testing the Hammock
22 May 2019 - 20:04

We tested out the hammock again now that lots of cabinets and what not have been installed. It works!
Spring Sunset from our Van Parking Spot
22 May 2019 - 20:55

We had to park the van on the street for months. The silver lining was sunsets like this!

Friday, May 24



Cabinet Door Planks
24 May 2019 - 10:57

These will become the rails and stiles for the bedside cabinet doors
Cabinet Door Jig
24 May 2019 - 12:29

To make sure all the grooves for the cabinet door planks were the same, Adam made this jig for the table saw
IMG_20190524_153837
24 May 2019 - 15:38

Saturday, May 25



Bedside Cabinet Doors Ready for Priming
25 May 2019 - 18:14
Lots of Painting Requires Man Power!
25 May 2019 - 21:05

Thanks friends!
Doors doors doors
25 May 2019 - 23:15

Primed and ready for painting

Sunday, May 26



Our Paint color in contrast with the Primer
26 May 2019 - 11:59

Our color scheme for the van is this grey color and dark blue
Napping on the Job
26 May 2019 - 14:04

He loves laying on the warm asphalt in the sun
Installing the Backsplash
26 May 2019 - 17:54

We decided on a metal backsplash for easy cleaning and magnetism!

Monday, May 27



Hinges installed on the Bedside Cabinet Doors
27 May 2019 - 12:58
Bedside Cabinet Doors Installed
27 May 2019 - 17:27
Back view looking into the van with the Bedside Cabinet Doors Installed
27 May 2019 - 17:28
The Galley
27 May 2019 - 17:29

The oven, backsplash, upper cabinet and thermostat are installed!
The Galley-- Oven and Fridge
27 May 2019 - 17:29
Bench down in Bed Mode
27 May 2019 - 17:29

The feet on the back of the bench flip down and support it so we can climb into the bed
Where did the Water Heater go??
27 May 2019 - 17:30

4 long days of work and all of the cabinet doors are created and installed! Stacy has completed an absolutely huge number of smaller tasks, working to fully close out lots of systems in the van, including a fully completed kitchen!

Friday, May 31



Testing out little Shelves for the USB Outlets
31 May 2019 - 15:18

Saturday, June 1



Soldering wires for the Water Tank Gauge
1 Jun 2019 - 12:46

Thank goodness for AC outlets in the van!
Installed this metal edge Along the Kitchen Floor
1 Jun 2019 - 12:46

This protects the edge along with silicon caulk and provides water proofing so any water from wet feet up front won't seep under the floor into the insulation
Water Gauge Installed!
1 Jun 2019 - 15:24

The black screen you can see on the bedside cabinet is the gauge that measures how much water we have left in our tank. The white rectangle on top of the oven is the under cabinet lighting ready to be installed
Supervising Van Cleaning
1 Jun 2019 - 16:43

The Husky Shop vac helps again
Cover the the Charge Controller
1 Jun 2019 - 17:21

We need to be able to access the wires for the charge controller + it needs air flow for cooling... this cover makes it all look nice while hiding the wires!
Scotch and Painting
1 Jun 2019 - 17:35

Scotch makes it all better
Slacking on the Job
1 Jun 2019 - 18:15

This dog is not a hard worker
Lock Box installed
1 Jun 2019 - 18:22

This steel plate locks onto the seat for secure storage
Furnace Thermostat Installed
1 Jun 2019 - 18:23
USB shelves installed... Can you see them!?
1 Jun 2019 - 19:15

Under the Carabiner and next to the AC outlet
Charge Controller Cover
1 Jun 2019 - 19:19

Stained and Installed!

Sunday, June 2



Taking the protective Cover off the Mattress
2 Jun 2019 - 12:05

Had to remove this to get to the mattress to cut it!
Trimming our Mattress to fit in the Van
2 Jun 2019 - 12:36

Our bed area is just a few inches shy of a queen size bed
Comfy Bed
2 Jun 2019 - 13:09

Van work is exhausting, let's nap in the sun!
More naps
2 Jun 2019 - 13:10

This bed is comfy!
Spice Containers and Alex Honnold Spatula
2 Jun 2019 - 13:22
Careful Measurements
2 Jun 2019 - 14:19
Paper Towel Holder Installed
2 Jun 2019 - 14:30
Van Chilling with Beers!
2 Jun 2019 - 18:34

Finally getting to the point where we can just hang out in the van... almost.
Scotch in our Nature Glasses!
2 Jun 2019 - 19:20

Lots of finishing tasks. Finally cleaned up the remaining electrical and wires. The mattress is cut. Getting and installing lots of kitchen stuff.

Monday, June 3



Kepler Supervising Curtain Sewing
3 Jun 2019 - 10:58

Spoiler alert, never got this sewing machine to work

Tuesday, June 4



Mary Supervising yet another Water Heater Install
4 Jun 2019 - 19:13

Thursday, June 6



Testing out the Table Legs
6 Jun 2019 - 18:17

Hey... this might work!
The table works!
6 Jun 2019 - 19:38

Can Stacy even contain her excitement?! Poor Stacy, always tired.
Getting Kitchen Accessories Installed
6 Jun 2019 - 20:09

MAGNETS HOW DO THEY WORK?

Saturday, June 8



Staining the Table (featuring Chris Owens)
8 Jun 2019 - 15:13
Prepping the Kitchen Accessories
8 Jun 2019 - 16:17
Kitchen Table Stained and ready to be put Together
8 Jun 2019 - 17:01
Little Buddies Hanging Out in the Driveway
8 Jun 2019 - 19:30
Copurrnicus demands Love
8 Jun 2019 - 19:35
Emptied all these into the Van Spice Containers
8 Jun 2019 - 22:35
Van Spices! All full and ready to go into the van.
8 Jun 2019 - 22:38

Sunday, June 9



Owens was here...
9 Jun 2019 - 11:49
Table is Installed
9 Jun 2019 - 14:13

Adam feeling proud of his creation!
Table deployed in table position
9 Jun 2019 - 14:18
Kitchen Table Folded Up
9 Jun 2019 - 14:20

The table folds up into this position for space saving
Beers at PostDoc after a day of Van Work
9 Jun 2019 - 19:13

postdocbrewing.com/
A Friendly Visitor
9 Jun 2019 - 19:54

Getting beers at PostDoc Brewing after a hard day of van work, this little pup walked over into Adam's lap to say Hurro

The table is installed!!! This is the last major construction task for the van. There are still a number of small finishing tasks, but we won't have to spend every night after work and every weekend working on the van anymore.

Monday, June 10



Stacy working on our curtains
10 Jun 2019 - 13:48

Tuesday, June 11



The Bed is Ready!
11 Jun 2019 - 19:53
The bed from the back
11 Jun 2019 - 21:16

Looking into the van from the outside in the back
Bed Time
11 Jun 2019 - 21:16

The bed in its configuration for sleeping complete with our Rumpl Blanket

Stacy finished sewing and modifying all of the linens, so we finally got the bed installed! Lots of small bits arrived from Amazon and got installed bringing us very close to 100% completion.

Sunday, June 16



Bedside Storage Pocket
16 Jun 2019 - 13:26

Space is at a Premium. We decided not to put a shelf here so we wouldn't hit our heads but Stacy needed a place to put books, her cell phone, etc
Shower Curtain is Ready to Go
16 Jun 2019 - 13:43

With our hot water heater installed in the back, we'll shower here while we are on the road
Mirror Installed Above the Sink
16 Jun 2019 - 13:57
Gear Bins packed and Ready To Go
16 Jun 2019 - 15:08

All our climbing, skiing, hiking and general outdoorsing gear fits under the bed in these plastic bins
Best Buds
16 Jun 2019 - 15:09

These 2 love hanging out together while we work on the van
Copurrnicus Brown, Van Explorer
16 Jun 2019 - 20:30
Kitchen Ready for Cooking
16 Jun 2019 - 22:12

We installed a little bungee cord to keep dry goods in place on the counter

Monday, June 17



Lots of small tasks, shower curtain system, mirror, all our gear put in the van, and began filling out the staple foods in the kitchen.

Tuesday, June 18



Guide Books Ready to Guide
18 Jun 2019 - 18:42

So many places so little time...
Locked up like Fort Knox
18 Jun 2019 - 19:06
Lock Plate for extra security
18 Jun 2019 - 19:07

Wednesday, June 19



The Cushion covers have arrived
19 Jun 2019 - 12:36

After many weeks and zero communication, our cushion covers were finally delivered.
All the Foam for the Bench Cushions
19 Jun 2019 - 13:08

All this foam needs to be cut into the custom sizes we need for the bench cushions
Making a Straight Line to Cut
19 Jun 2019 - 20:45
Putting the Foam into the Cushion Covers
19 Jun 2019 - 20:53
Cutting Foam for Bench Cushions
19 Jun 2019 - 21:24
The Bench Cushions
19 Jun 2019 - 21:53

Ready to go in the van
Cushions are in Place
19 Jun 2019 - 22:00
The Cushions are Here!
19 Jun 2019 - 22:08

The cushions are in place and this guy is happy to sit and enjoy the van

Thursday, June 20



THE CUSHIONS ARE COMPLETE!

Bill helping upgrade my laptop
20 Jun 2019 - 20:23
Upgrading storage on my laptop
20 Jun 2019 - 21:53

Going to be in a van for a year, I need to have everything installed at once! Stop all the downloading!

Bill is helping me upgrade my laptop before we set off in the van for a year.

Friday, June 21



Giving her her second bath!
21 Jun 2019 - 21:22
Adam getting SOAKED cleaning the van
21 Jun 2019 - 21:29
Adam cleaning the van
21 Jun 2019 - 21:30

Saturday, June 22



Lucky seems like like his bed between us while we drive
22 Jun 2019 - 11:21
Heading off to test her out!
22 Jun 2019 - 14:14
Stacy cooking lunch
22 Jun 2019 - 15:09
Lucnh is served
22 Jun 2019 - 15:16
Lucky wants to go exploring!
22 Jun 2019 - 15:18
Our view
22 Jun 2019 - 15:33
Testing out the bed
22 Jun 2019 - 15:34
Shes good looking I think
22 Jun 2019 - 15:34
Lucky on patrol
22 Jun 2019 - 15:35
Testing out the bed
22 Jun 2019 - 15:35
Stacy surveying the land as van looks on
22 Jun 2019 - 16:49
Whats over there?
22 Jun 2019 - 17:03
Lucky got over his fear of water
22 Jun 2019 - 17:10
Flowers!
22 Jun 2019 - 17:11
Testing is fun
22 Jun 2019 - 17:21
Reorganizing gear storage in the garage
22 Jun 2019 - 17:35
testing out our chairs and table
22 Jun 2019 - 17:44
Garage is much more organized now
22 Jun 2019 - 17:50
Yes this will work
22 Jun 2019 - 18:00
Important test material
22 Jun 2019 - 18:03
Trying out our chairs
22 Jun 2019 - 18:07
Lunch at our table!
22 Jun 2019 - 18:41

Watching friends to make sure it's still funny in the van
Hello slug friend
22 Jun 2019 - 20:04
Testing out our gaming area, it works!!
22 Jun 2019 - 20:40
Lucky in his bed at our feet
22 Jun 2019 - 21:27
Lucky skeptical of this bed
22 Jun 2019 - 23:41

Sunday, June 23



Lucky on the bed
23 Jun 2019 - 09:24
Stacy making breakfast
23 Jun 2019 - 09:58
Made up our bed before heading out
23 Jun 2019 - 10:31
Heading out on the mountain loop heighway
23 Jun 2019 - 11:00
Heading home after a successful test
23 Jun 2019 - 12:06

A very successful shake down cruise! Everything worked beautifully! We identified some changes we want to make, but over all we couldn't be happier